Chou, C. H., J. W. Chai, L. Wang (王立志), J. Fu, Y. S. Lin, P. J. Chang, W. H. Chen* (2023.09). Lesion Size of Early Cerebral Infarction on a Non-Contrast CT Influences Detection Ability in Cascade Mask Region-Convolutional Neural Networks. Biomedical Signal Processing and Control, 86, 105065.
期刊論文
57筆資料 more...
4. Wang, L. (王立志), Chun-Chih Chen*, and C. C. Hsu (2022.08). Applying machine learning and GA for process parameter optimization in car steering wheel manufacturing. International Journal of Advanced Manufacturing Technology, 122, 4389-4403.
Li-Chih Wang (王立志), Chun-Chih Chen, Jen-Li Liu, Pei-Chun Chu (2021.01). Framework and deployment of a cloud-based advanced planning and
scheduling system. Robotics and Computer-Integrated Manufacturing, 70, 102088-102088.
Yu-Xiu Chena, Li-Chih Wang(王立志)*, Pei-Chun Chub (2020.06). A recipe parameter recommendation system for an autoclave process and an
empirical study. Procedia Manufacturing, 51, 1046-1053.
Jen-Li Liu, Li-Chih Wang(王立志)* & Pei-Chun Chu (2019.06). Development of a Cloud-based Advanced Planning and Scheduling System for Automotive Parts Manufacturing Industry. Procedia Manufacturing, 38, 1532-1539.
Wang, L .(王立志)*, P. C. Chu, S. Y. Lin (2019.01). Impact of capacity fluctuation on throughput performance for semiconductor wafer fabrication. Robotics & Computer Integrated Manufacturing, 55, 208-216.
Wang, L. (王立志)*, A. Wang, C. Y. Chueh (2018.10). Development of a capacity analysis and planning simulation model for semiconductor fabrication. International Journal of Advanced Manufacturing Technology, 99(4), 37-52.
Chen, T., L. Wang (王立志), M. C. Chiu (2018.10). A Multi-granularity Approach for Estimating the Sustainability of a Factory Simulation Model – Semiconductor Packaging as an Example. Operational Research – An International Journal, 18(3), 711-729.
Lin, Y. C., T. C. Chen, L. Wang (王立志) (2018.10). Integer nonlinear programming and optimized weighted-average approach for mobile hotel recommendation by considering travelers. Operational Research – An International Journal, 18(3), 625-643.
王立志*,范書愷,丁慶榮,郭財吉,林春成,許嘉裕(2018.04)。工業工程與系統管理之回顧與展望。管理與系統,25(3),381-412。
Wang, Y. C., T. C. Chen, L. Wang (王立志) (2017.09). Simulating a Semiconductor Packaging Facility: Sustainable Strategies and Short-time Evidences. Procedia Manufacturing, 11, 787-795.
Chen, Y. W., L. Wang*, A. Wang, T. L. Chen (2017.02). A particle swarm approach for optimizing a multi-stage closed loop supply chain for the solar cell industry. Robotics & Computer Integrated Manufacturing, 43, 111-123.
Wang, L., C. Y. Cheng*, W. K. Wang (2016.01). Flexible supply network planning for hybrid shipment: A case study of memory module industry. International Journal of Production Research, 54(2), 444-458.
Wang, L., C. Y. Cheng, Y. T. Tseng*, Y. F. Liu (2015.12). Demand-pull replenishment model for hospital inventory management: a dynamic buffer adjustment approach. International Journal of Production Research, 53(24), 7533-7546.
Li-Chih Wang(王立志)、 Yin-Yann Chen(陳盈彥)、Tzu-Li Chen(陳子立)、Chen-Yang Cheng(鄭辰仰)、Chin-Wei Chang (2014.10). A Hybrid Flowshop Scheduling Model Considering Dedicated Machines and Lot-splitting for the Solar Cell Industry. International Journal of Systems Science, 45(10), 2055-2071.
Li-Chih Wang(王立志), Chen-Yang Cheng(鄭辰仰) (2014.10). Development of an integrated demand-supply balancing system for supply chain exception handling. International Journal of Information Systems and Change Management, 7(1), 70-91.
Liu, Jih-Hsin(劉日新), L. Saravanan, Hsin-Yuan Miao(苗新元), Li-Chih Wang(王立志) (2013.12). Thermoelectric Properties of Transition Metal Deposited MWCNT Buckypaper. Applied Mechanics and Materials, 479-480, 110-114.
Saravanan, L., Jih-Hsin Liu(劉日新), Hsin-Yuan Miao(苗新元), Li-Chih Wang(王立志) (2013.12). Preparation and Investigation of Co-dispersed MWCNT Buckypaper for the Microwave Absorption. Applied Mechanics and Materials, 479-480, 20-24.
Jih-Hsin Liu(劉日新)、Hsin-Yuan Miao(苗新元)、Saravanan Lakshmanan、Ren-Hui Tsai (2013.09). Fabrication of Metal Alloy Deposited Flexible MWCNT Buckypaper for Thermoelectric Applications. Journal of Nanomaterials, 2013, 1-6.
Wang, LC(王立志), C. Y. Cheng(鄭辰仰), S. K. Lin(林献琨) (2013.03). Distributed feedback control algorithm in an auction-based manufacturing planning and control system. International Journal of Production Research, 51(9), 2667-2679.
Liu, Jih-Hsin(劉日新), Hsin-Yuan Miao(苗新元), L. Saravanan, Li-Chih Wang(王立志), Ren-Hui Tsai (2013.03). Tuning of thermoelectric property in the flexible MWCNT buckypaper. Asian Journal of Chemistry, 25, 27-29.
Tsao, Che-Wei, L. Saravanan, Jih-Hsin Liu, Hsin-Yuan Miao, Li-Chih Wang, Jui-Wen Pan (2013.03). Microwave absorption properties of silver doped MWCNT buckypaper. Asian Journal of Chemistry, 25, 5-8.
Hsin-Yuan Miao(苗新元), Jih-Hsin Liu(劉日新), L. Saravanan, Li-Chih Wang(王立志), Tu-Way-Chen (2013.03). Photocurrent generation of TiO2 and Cuo doped MWCNT bucky paper. Asian Journal of Chemistry, 25, 9-11.
Li-Chih Wang(王立志)、Chen-Yang Cheng(鄭辰仰)、Shin-Lun Hsu(徐世倫) (2013.01). A Closed-loop Feedback Simulation for RFID-based Manufacturing Planning and Control System. Int. J. of Information Technology and Management, 12(12), 106-128.
Chen, Y.W., C. Y. Cheng, H. Y. Miao, M. Zhang, R. Liang, C. Zhang, L. Wang*, B. Wang (2013.01). Application of Response Surface Methodology in the Optimization of Laser Treatment in Buckypaper Lighting for Field Emission Displays. International Journal of Advanced Manufacturing Technology, 64(1-4), 515-536.
王立志,曾雅彩,林獻琨(2013.01)。「多方多點多部門產學合作創新模式-以共同開發記憶體模組產業供應鏈規劃系統為例」。管理與系統,20(1),119-137。
Yin-Yann Chen(陳盈彥)、Chen-Yang Cheng(鄭辰仰)、Li-Chih Wang(王立志)、Tzu-Li Chen(陳子立) (2013.01). A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems- a case study for solar cell industry. International Journal of Production Economics, 1(141), 66-78.
Chen-Yang Cheng(鄭辰仰)、Tzu-Li Chen(陳子立)、 Li-Chih Wang(王立志)、Yin-Yann Chen(陳盈彥) (2013.01). “A Genetic Algorithm for Multi-Stage and Parallel-Machine Scheduling Problems with job splitting – A Case Study for the Solar Cell Industry”. International Journal of Production Research, 51(16), 4755-4777.
Wang,L.,H.L.Shih(2011.06)。An advanced overlapping production planning model in manufacturing supply chain.。Journal of Manufacturing Technology Management.,22(7),-。
王立志, 林獻琨(2011.06)。有向圖型為基礎之供應鏈規劃系統-以記憶體模組產業為例。Journal of Management & Systems,,-。
王立志,曾雅彩,林獻琨(2011.02)。多方多點多部門產學合作創新模式-以共同開發記憶體模組產業供應鏈規劃系統為例。管理與系統,,-。
Wang,C., Wang,L. (2011.02). A Genetic Algorithm (GA) Based Forecasting Model Focused On Contextual Factors: Empirical Results.. Journal of Knowledge Globalization., 4(1), 25-53.
王立志(2011.01)。「TFT-LCD訂單滿足規劃」。工程科技通訊,(114),10-11。
曾雅彩,王立志(2010.12)。應用SCOR模式建立流程績效衡量指標之研究。運籌管理評論,4(1),85-102。
Wang, C. and Wang, L. (2010.11). A GA-based Sales Forecasting Model Incorporating Promotion Factors. Journal of Modern Applied Statistical Methods, 9(2), 520-535.
周玉俐,王立志(2010.10)。成霖公司需求鏈管理解決方案的發展。電子商務學報,12,1-24。
Wang, L., Cheng, C.Y., Huang, L.P. (2010.09). A Genetic Algorithm for Directed Graph-based Supply Network Planning in Memory Module Industry. Industrial Engineering & Management Systems, 9(3), 227-241.
王立志(2010.09)。光電/液晶顯示器產業供應鏈管理應用。自動化科技學會會刊,,14-22。
Wang, C., Wang, L. (2009.12). A forecasting model with consistent adjustments for anticipated future variations. Journal of Applied Quantitative Methods, Vol.4, pp.463-484., 4, 463-484.
王立志,曾雅彩(2009.09)。花仙子公司績效衡量與管理系統的發展。中山管理評論,17(3),573-601。
王立志,林獻琨 (2009.06). A multi-agent based agile manufacturing planning and control system. Computers & Industrial Engineering (SCI & EI), 57, 620-640.
曾雅彩,王立志(2007.12)。花仙子之需求與配銷規劃。管理評論,26,55-70。
王立志,施宏霖(2007.03)。TFT-LCD業多階多廠區生產規劃模式之發展。工程科技通訊,(91),-。
王立志,林獻琨(2007.01)。應用於成品布紡織業的整合性生產規劃與排程模式。紡織綜合研究期刊,17(1),1-19。
張育仁,李慶恩,王立志(1998.11)。自我調適的動態系統-限制排程、模糊理論和遺傳演算法的應用。工業工程學刊,15(6),-。
Wang,L., S.Y.Wu (1998.09). Modeling with Colored Timed Object-Oriented Petri Nets for Automated Manufacturing Systems. Computers and Industrial Engineering, 34(2), 463-480.
Wang, L. and M.R. Lee (1998.08). Modeling A FMS With Colored Timed Object-oriented Petri Nets. Journal of the Chinese Society of Mechanical Engineers, 19(6), 573-580.
王立志,吳紹穎(1998.05)。以彩色時間性物件導向斐氏圖為基礎之自動化製造系統排程方法。工業工程學刊,15(3),269-286。
Wang, L (1996.09). The Development of an Object-Oriented Petri Net Cell Control Model. International Journal of Advanced Manufacturing Technology, 11(1), 59-69.
Wang, L. (1996.08). Object-oriented Petri Nets for Modelling and Analysis of Automated Manufacturing Systems. Computer Integrated Manufacturing Systems, 26(2), 111-125.
Wang, L (1996.08). An Integrated Object-Oriented Petri Net Paradigm for Manufacturing Control Systems. International Journal of Computer Integrated Manufacturing, 9(1), 73-87.
Wang, L., H. M. Chen and C. M. Liu (1995.04). Intelligent Scheduling with Inductive Learning Capability using Neural Networks. International Journal of Flexible Manufacturing Systems, 7(2), 143-171.
王立志,林我聰,游錫濱,邱宏昇,陳建光(1994.07)。製造資訊系統個體導向系統分析方法。工業工程學刊,11(3),137-146。
Wang, L.(1993.07)。The Development of a Neural Network based Due Date Assignment Model。Jouranl of the Chinese Institute of Industrial Engineers,10(3),209-217。
Wang, L. and W. E. Wilhelm (1993.03). A PERT-Based Paradigm for Modeling Assembly Operations. IIE Transactions, 25(2), 88-103.
王立志,魏傳益(1992.07)。小批量裝配系統中物料流程模式之建立。工業工程學刊,9(2),25-33。
Wang, L., W. E. Wilhelm(1992.01)。A Recursion Model for Cellular Production/Assembly Systems。International Journal of Flexible Manufacturing Systems,14(2),129-158。
研討會論文
63筆資料 more...
Yu-Xiu Chena, Li-Chih Wanga(王立志),*, Pei-Chun Chub (2020.06). A recipe parameter recommendation system for an autoclave process and an
empirical study. Paper presented at 30th International Conference on Flexible Automation and Intelligent Manufacturing (FAIM2020), Athens, Greece: University of Athens.
Chun-Yee Lee, Pei-Chun chu(朱珮君), Li-Chih Wang(王立志)* (2019.12). Development of a Cloud-based Advanced Planning and Scheduling System Framework and Modeling Approach. Paper presented at Asia Pacific Industrial Engineering & Management Systems Conference 2019, Kanazawa City, Japan: Kanazawa University Kakuma, Kanazawa, Ishikawa,.
Jen-Li Liu, Li-Chih Wang(王立志)*, and Pei-Chun Chu(朱珮君) (2019.06). Development of a Cloud-based Advanced Planning and Scheduling System for Automotive Parts Manufacturing Industry. Paper presented at 29th International Conference on Flexible Automation and Intelligent Manufacturing (FAIM2019), Ireland: University of Limerick Ireland.
Jen-Li Liu, Pei-Chun chu(朱珮君), Li-Chih Wang(王立志)* (2018.12). Application of a Cloud-based Advanced Planning and Scheduling System in Metal Manufacturing Industry. Paper presented at Asia Pacific Industrial Engineering & Management Systems Conference 2018, 中國, 香港, 香港大學: 香港大學.
Tzu-Han Hsu, Li-Chih Wang(王立志)*, and Pei-Chun Chu(朱珮君) (2018.06). Development of a Cloud-based Advanced Planning and Scheduling System. Paper presented at 28th International Conference on Flexible Automation and Intelligent Manufacturing (FAIM2018), Columbus, OH, USA: OHIO University.
Wang, L. , F. J. Chen, P. C. Chu (2017.12). Application of object-oriented Petri net in developing an Industry 4.0 cyber physical production system. Paper presented at he 18th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2017), Yogyakarta, Indonesia: Bandung Institute of Technology.
Wang, Y. C., T. C. Chen, L. Wang (2017.06). Simulating a Semiconductor Packaging Facility: Sustainable Strategies and Short-time Evidences. Paper presented at The 27th International Conference on Flexible Automation and Intelligent Manufacturing (FAIM 2017), Modena, Italy: University of Modena and Reggio Emilia.
Li-chih Wang,Ching-I Chen , and Chun-Ya Chueh (2016.12). Development of a Capacity Planning Simulation Model for Semiconductor Wafer Fabrication. Paper presented at 17th Asia Pacific Industrial Engineering and Management Systems Conference, Taipei, Taiwan: Ministry of Science and Technology, Taiwan.
Li-Chih Wang , Si-Yi Lin, and Ching-I Chen (2016.06). Simulation-based capacity impact analysis for semiconductor fabrication. Paper presented at 26th International Conference on Flexible Automation
and Intelligent Manufacturing (FAIM 2016), 韓國/漢城: Korea Science and Technology Center,Yonsei University, Seoul, Korea.
Tai-Yen Tseng, Li-Chih Wang and Chun-Ya Chueh (2015.10). Development of a Capacity Analysis and Planning Simulation Model for Semiconductor Fabrication. Paper presented at 2015 International Symposium on Semiconductor Manufacturing Intelligence, Daejeon, South Korea: Korea Advanced Institute of Science and Technology.
Allen Wang, Li-Chih Wang, and Yi-Wen Chen (2015.07). A Particle Swarm Optimization Approach for Solar Cell Industry Multi-Stage
Closed Loop Supply Chain Model. Paper presented at The 10th International Congress on Logistics and SCM Systems, Chiang Mai: Asian Institute of Technology.
Allen Wang, Li-Chih Wang, Si-Yi Lin and Pu-Tai Yang (2015.06). Development of a Capacity Planning and Analysis Simulation Model for Semiconductor Fabrication. Paper presented at The International Conference on Flexible Automation and Intelligent Manufacturing, Wolverhampton: University of Wolverhampton,UK.
王立志、林聖傑(2014.12)。整合性綠色供應鏈網絡設計與規劃模式。論文發表於第五屆海峽兩岸區域發展論壇—協同創新與永續發展,東海大學茂榜廳:東海大學。
Chun-Ya Chueh, Allen Wang, and Li-CHih Wang (2014.10). Design and Development of A Semiconductor Capacity Planning Simulation System. Paper presented at 2014 Asia Pacific Industrial Engineering and Management Systems (APIEMS 2014), Ramada Plaza Jeju Hotel, Jeju, Korea: Asia Pacific Industrial Engineering and Management Systems.
Chueh, C. Y., A. Wang, and L. Wang (2014.08). Design and Development of A Simulation System for Semiconductor Capacity Planning. Paper presented at 2014 International Symposium on Semiconductor Manufacturing Intelligence (ISMI 2014), Palais de Chine ,Taipei, Taiwan.: Semiconductor Technologies Empowerment Partners Consortium, Taiwan (STEP Consortium).
Chen, Y. W., L. Wang, T. L. Chen, Allen Wang, C. Y. Chen (2014.05). A Multi-Objective Model for Solar Industry Closed-Loop Supply Chain by Using Particle Swarm Optimization. Paper presented at 24th International Conference of Flexible Automation and Intelligent Manufacturing (FAIM 2014), San Antonio, Texas, U.S.A.: International Conference of Flexible Automation and Intelligent Manufacturing (FAIM).
Wang, L., Y. J. Wong, T. L. Chen, S. T. Chen, and C. M. Li (2014.01). Parameter-based Preemptive Objective Optimization for Solar Cell Manufacturing. Paper presented at International Conference of Industrial Engineering and Operations Management (IEOM), Bali, Indonesia: 4th International Conference of Industrial Engineering and Operations Management (IEOM 2014).
王立志,林聖傑,曾台彥(2013.12)。應用多目標基因演算法於正逆向物流整合型永續供應鏈網絡設計。論文發表於工業工程學會年會暨學術研討會,屏東科技大學:社團法人中國工業工程學會。
Wang, L., T. L. Chen, Y. Y. Chen, and Y. W. Chen, Allen Wang(2013.06)。Closed-Loop Sustainable Supply Chain Design under Uncertainties。論文發表於Paper presented at 23rd International Conference of Flexible Automation and Intelligent Manufacturing (FAIM 2013),Porto, Portugal:FAIM 2013。
Liu, J. H., H. Y. Miao, L. Saravanan, L. Wang(2013.03)。Tuning of thermoelectric property in the flexible MWCNT buckypaper。論文發表於Paper presented at International Conference on Nanoscience & Nanotechnology (ICONN 2013),India:ICONN 2013。
Tsao, C. W., L. Saravanan, J. H. Liu, H. Y. Miao, L. Wang*,
J. W. Pan,(2013.03)。Microwave absorption properties of silver doped MWCNT buckypaper。論文發表於Paper presented at International Conference on Nanoscience & Nanotechnology (ICONN 2013),India:ICONN 2013。
Miao, H. Y., J. H. Liu, L. Saravanan, L. Wang*,
T. W. Chen,(2013.03)。Photocurrent generation of TiO2 and Cuo doped MWCNT buckypaper。論文發表於Paper presented at International Conference on Nanoscience & Nanotechnology (ICONN 2013),India:ICONN 2013。
李淑芬,翟悅清,王立志,翁玉潔(2012.12)。「考量節稅之全球供應鏈網絡生產規劃模式」。論文發表於工業工程學會年會暨學術研討會,彰化:工業工程學會年會暨學術研討會。
王立志,陳子立,王中俊,林聖傑,王心恕(2012.12)。「考量不確定性之正逆向物流整合型永續供應鏈網絡設計」。論文發表於工業工程學會年會暨學術研討會,彰化:工業工程學會年會暨學術研討會。
王立志,陳盈彥,蔡忠軒,李承玫(2012.12)。「考量碳排放之綠色供應鏈生產規劃模式以矽晶太陽能電池產業為例」。論文發表於工業工程學會年會暨學術研討會,彰化:工業工程學會年會暨學術研討會。
周忠信、王立志、錢?、陳?儒、袁國硯、?冠瀚(2012.10)。「應用軟體的微量需求代工案例探討」。論文發表於International Symposium on Software Technology,Nanjing, China:International Symposium on Software Technology。
Li-Chih Wang, Chen-Yang Cheng, Tzu-Li Chen, Yin-Yann Chen, Chung-Chun Wang (2012.08). A Multi-Stage and Parallel-Machine Scheduling Problem for Solar Cell Industry. Paper presented at 2012 The 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI 2012), 北京清華大學: 中國機械工程學會工業工程分會.
Li-Chih Wang, Chen-Yang Cheng, Tzu-Li Chen,Yin-Yann Chen (2012.06). An Integrated Algorithm for Solar Cell Parallel Machine Scheduling Problems.. Paper presented at 22nd International Conference on Flexible Automation and Intelligent Manufacturing (FAIM 2012), Technology Dept. of Production Engineering & Helsinki, Finland: FAIM 2012.
Li-Chih Wang, Shu-Fen Li, and Yueh-Ching Jai(2012.04)。The Hybrid-PSO approach in production scheduling with parallel machines problem: case in DRAM module industry.。論文發表於POMS 23rd Annual Conference,Chicago:POMS。
Li-Chih Wang, Yin-Yann Chen, Chen-Yang Cheng, Chin-Wei Chang and Chung-Hsuan Tsai (2012.04). An optimal production scheduling model of hybrid flow shop - a case of solar cell industry.. Paper presented at POMS 23rd Annual Conference, Chicago: POMS.
王立志,鄭辰仰、莊閔智、洪梓皓(2011.12)。應用基因演算法於多階平行機台排程-以晶矽太陽能電池為例。論文發表於兩岸工業工程與管理學術研討會,新竹:中國工業工程學會。
王立志,張晉瑋(2011.12)。考量專用機台及整備時間之混合流程型批量流問題排程最佳化模式-以太陽能電池產業為例。論文發表於兩岸工業工程與管理學術研討會,新竹:中國工業工程學會。
王立志,范惠菁,王中俊(2011.12)。民生消費用品製造業促銷需求預測模式之研究。論文發表於兩岸工業工程與管理學術研討會,新竹:中國工業工程學會。
Li-kai Chan, Sun-Hsuan Chi, Li-chih Wang, Ja-Hao Chen, and Chen-Yang Cheng(2011.11)。The wireless sensor network for home-care system using zigbee。論文發表於The 11th International Conference on Automation Technology,Yunlin, Taiwan:Automation Technology。
Wang, L.C., Lu, H.S., Zhang, B.Y., and Cheng, C.Y.(2011.06)。Analysis of Structure Complexity in Supply Chain Network.。論文發表於Paper presented at the 21st International Conference of Flexible Automation and Intelligent Manufacturing,Taichung:FAIM 2011。
Wang,L., Y.T.Tseng, Y.F.Liu, S.F.Li (2011.01). A Demand-Pull Replenishment Approach to Hospital Inventory Management with Dynamic Buffer Adjustment. Paper presented at The 2nd Production and Operation Management System-Hong Kong (POMS-HK) International Conference., Hong Kong: POMS-HK.
Cheng,C.Y., Wang,L., Hsu,S.L. (2011.01). Hybrid-GA based Material Allocation Planning for Production Assembly System –A Network Communication Equipment Manufacturing Industry Case. Paper presented at FAIM2011, Feng Chia University, Taichung, Taiwan: FAIM2011.
王立志,鄭辰仰,李淑芬,李禺澐(2010.12)。應用基因演算法於物料配置規劃之研究-以網路通訊設備製造業為例。論文發表於中國工業工程學會99年度研討會,台南:中國工業工程學會。
Cheng,C.Y., L.Wang, S.L.Hsu (2010.10). A Combined Simulation and Agent-based Approach to Manufacturing Planning and Control. Paper presented at 17th International Conference on Industrial Engineering and Engineering Management, Xiamen, China: Industrial Engineering and Engineering Management.
曾雅彩,王立志,劉怡芳,李淑芬(2010.09)。以DBR為基礎之動態醫療存貨管理模型。論文發表於仿真科學與技術學術研討會,福建省福州市:中國科學技術協會。
Cheng,C.Y., L.Wang, S.L.Hsu (2010.07). A Closed-loop Feedback Simulation for RFID-based Manufacturing Planning and Control System. Paper presented at Proceedings of the IEEE Transactions on Industrial Informatics, Florida, U.S.A: IEEE.
Cheng, C.Y., Wang, L., Hsu, S.L. (2010.06). Development of an Iterative Bidding Mechanism for Multi-agent Planning and Manufacturing Control System. Paper presented at The 14th World Multi-Conference on Systemics, Florida: Cybernetics and Informatics.
王立志,鄭辰仰,林獻琨,王文冠(2009.12)。以有向圖為基礎之ATP模式—以TFT-LCD產業為例。論文發表於中國工業工程學會98年度研討會,台中逢甲大學:中國工業工程學會。
Wang,L.,Chen-Yang Cheng, Sian-Kun Lin, Yu-Yun Lee (2009.12). Directed Graph based Supply Network Planning: Memory Module Industry Case.. Paper presented at Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference, Japan: APIEMS.
Wang,L., Chen-Yang Cheng, Hsin-Hung Chen, Wen-Kuan Wang (2009.09). A Directed Graph with Genetic Algorithm for Memory Module Supply Chain. Paper presented at Australian Society for Operations Research 2009, Australian: ASOR.
王立志,林獻琨,黃立品 (2009.07). A RFID based agile manufacturing planning and control system. Paper presented at the Fourth International Conference on Rough Sets and Knowledge Technology, Gold Coast, Australia: University of Southern Queensland.
王立志,鄭辰仰,林獻琨 (2009.06). The Development of a Directed Graph-based Supply Network Planning System. Paper presented at the IIE Annual Conference and Expo 2009, Miami, USA: Institute of Industrial Engineers.
王立志,鄭辰仰,林獻琨 (2009.06). Multi-site Production Planning Model for the Memory Module Industry. Paper presented at the IIE Annual Conference and Expo 2009, Miami, USA: Institute of Industrial Engineers.
王立志,吳政穎,陳信宏(2008.12)。記憶體模組產業之多廠區生產規劃模式。論文發表於中國工業工程學會97年度研討會,中原大學:中國工業工程學會,中原大學工業與系統工程學系。
王立志,王本善,賈德芸(2008.12)。民生消費性用品產業的促銷需求預測方法之研究。論文發表於中國工業工程學會97年度研討會,中原大學:中國工業工程學會,中原大學工業與系統工程學系。
Li-Chih Wang, Ya-Tsai Tseng, Sian-Kun Lin(2008.07)。A Case Study in the Design of an Integrated Demand-Supply Balancing System for Multi-Site Manufacturing。論文發表於Proceedings of 17th International Federation of Automatic Control (IFAC) World Congress,Korea:International Federation of Automatic Control (IFAC。
Wang, L., Y. T. Tseng, S. K. Lin, and C. Y. Hsieh (2007.12). An Integrated Demand-Supply Balancing System for Multi-Site Production Environment. Paper presented at Asia Pacific Industrial Engineering and Management Systems Conference, Taiwan: 雲林科技大學.
Wang, L. , Lin, S. (2006.12). A multi-agent based agile manufacturing planning and control system. Paper presented at The 36th CIE Conference on Computers & Industrial Engineering, 2006, Taiwan: Taiwan.
曾雅彩, 王立志(2006.12)。以SCOR模式為基礎發展運籌流程績效指標之建立架構。論文發表於中國工業工程學會95年度研討會,Taiwan:Tunghai University, Taiwan。
王立志, 林獻琨, 邱敬琮(2006.12)。應用於成品布紡織業的整合性生產規劃與排程模式。論文發表於中國工業工程學會95年度研討會,Taiwan:Tunghai University, Taiwan。
王立志, 王聖哲, 胡育旗(2006.12)。薄膜電晶體液晶顯示器產業之多廠區物料規劃模式。論文發表於中國工業工程學會95年度研討會,Taiwan:Tunghai University, Taiwan。
Wang L., Lin S.(2006.01)。The Application of RFID in Active Real Time Manufacturing Planning and Control System。論文發表於The International Conference on Logistics and Supply Chain Management,Hong Kong:Hong Kong University。
陳宏傑, 王立志(2005.12)。結合多維度解析之反應式投料機制。論文發表於中國工業工程學會94年度研討會,Taiwan:Taiwan。
陳信元, 王立志(2005.12)。多專案環境下以關鍵鏈為基礎之專案排程方法。論文發表於中國工業工程學會94年度研討會,Taiwan:Taiwan。
林獻琨, 王立志, 周忠信, 鄭松賓, 郭振堯, 羅國書(2004.12)。應用RFID的主動式現場監控與異常處理系統。論文發表於中國工業工程學會93年度研討會,Taiwan:成功大學。
吳玉琦, 王立志(2004.12)。先進規劃與排程系統應用於印刷電路板產業之研究。論文發表於中國工業工程學會93年度研討會,Taiwan:成功大學。
Shih H. , Wang L.(2004.12)。An Advanced Overlapping Production Planning Approach in Manufacturing Supply Chain。論文發表於Proceedings of the Asia Pacific Industrial Engineering and Management Systems Conference,Australia:Australia。
Wang L. , Shih H.(2004.03)。A Constraint-based Network Model of APS in Manufacturing Supply Chain。論文發表於2004 CIE Conference,Korea:Korea。
專書
(2006.07)。系統化運籌與供應鏈管理-企業營運新典範。:滄海書局。(ISBN:9867287827)
(2003.01)。供應鏈實戰手冊-應用APS跨越MRP鴻溝(首部曲:物料規劃)。:鼎誠資訊股份有限公司。(ISBN:9572825105)
(1999.06)。系統化運籌與供應鏈管理。:滄海書局。(ISBN:9578355467)
專書部份章節
A. Wang, L.C. Wang and Y. W. Chen (2015.11). A Particle Swarm Optimization Approach for Solar Cell Industry Multi-stage Closed-Loop Supply Chain Model. In Kachitvichyanukul, Voratas, Sethanan, Kanchana, Golinska- Dawson, Paulina (Ed.), Toward Sustainable Operations of Supply Chain and Logistics Systems (pp. 445-459). : Springer International Publishing.(ISBN:978-3-319-19006-8)